• Grade Tonnage Curve: How Far Can It Be Relied Upon?

    mining method economics With all the rigour to calculate a constrained (by the mining method) grade tonnage curve it is first necessary to calculate (estimate or simulate) the resources in blocks and then to simulate the mining method afterwards to obtain the minable reserves. The problem

    Get Price
  • Mining MethodsPart II: Surface MiningPlanning and Design ...

    Mining MethodsPart II: Surface MiningPlanning and Design of Open Pit Mining Presentation (PDF Available) · March 2010 with 13,903 Reads How we measure 'reads'

    Get Price
  • CHAPTER 11 Mining Technology Princeton University

    three surface mining techniques that are used in the West: 1) area strip, 2) open pit, and 3) terrace pit; two methods of underground mining in the West: 1) room and pillar with continuous miners, and 2) longwall mining; recent underground mining technology developments in Europe and the Western United States that could affect the

    Get Price
  • Percentage of completion method — AccountingTools

    Jan 19, 2019· Overview of the Percentage of Completion Method. The percentage of completion method calculates the ongoing recognition of revenue and expenses related to longerterm projects based on the proportion of work completed. By doing so, the seller can recognize some gain or loss related to a project in every accounting period in which the project continues to be active.

    Get Price
  • COST ESTIMATION FOR OPEN PIT MINES: TACKLING COST ...

    A method is presented to calculate the cost of uncertainty in a production schedule based on deviations from the target production.

    Get Price
  • DETERMINATION OF SHOVEL TRUCK PRODUCTIVITIES IN .

    A variety of mining equipment is used in the mining of oil sands by surface mining. This includes bucket wheel excavators, draglines, hydraulic shovels and offhighway trucks.

    Get Price
  • Estimation of the potential production rate ...

    Summary. Taylor's rule is the best way get a preliminary estimate of the production rate and the mine life during mine design. This is due to its simplicity of calculation since it involves only one variable, as well as the real world applicability of the rule since it is built upon real world data.

    Get Price
  • Methods for Equipments Selection in Surface Mining; review

    Methods for Equipments Selection in Surface Mining; review *,, ... size of equipment and calculation of required numbers, the present article focuses on different application methods in each of these phases, their advantages and shortcomings.

    Get Price
  • explosives – Mining and Blasting

    Jun 14, 2018· POWDER FACTOR. In construction blasting, powder factor (PF) is expressed as quantity (unit mass) of explosive per unit volume of material blasted. For mining, it is usually expressed as quantity of explosive per ton of material (or sometimes tons of material per unit mass of explosive). Fig – 5

    Get Price
  • Fuer Homepage Valuation of Metals and Mining Companies

    Mining is the science, technique, and business of mineral discovery and exploitation. Mining includes all activities related to extraction of metals, minerals and gemstones. Strictly, the word connotes underground work directed to severance and treatment of ore or associated rock.

    Get Price
  • Calculate OEE – Definitions, Formulas, and Examples | OEE

    Simple Calculation. The simplest way to calculate OEE is as the ratio of Fully Productive Time to Planned Production Time. Fully Productive Time is just another way of saying manufacturing only Good Parts as fast as possible (Ideal Cycle Time) with no Stop Time. Hence the calculation is:

    Get Price
  • Potash Case Study | AZGS

    Calculating tonnage for the entire deposit, assuming 6% and 20% grades, yields 682 million metric tons to billion metric tons, respectively. Proximity to Petrified Forest National Park Approximately 20% of the deposit underlies Petrified Forest National Park and is closed to mining.

    Get Price
  • Greenhouse Gases Equivalencies Calculator Calculations ...

    Total CO 2 emissions for energy use per home: metric tons CO 2 for electricity + metric tons CO 2 for natural gas + metric tons CO 2 for liquid petroleum gas + metric tons CO 2 for fuel oil = metric tons CO 2 per home per year.

    Get Price
  • Dilution and ore recovery QueensMineDesignWiki

    The issue of balancing dilution and ore recovery is a challenging one as profitability is to be optimized while not effecting the efficiency of operation. It has been noted that instead of utilizing labour intensive mining methods to high tonnage bulk mining has decreased the ability to control ore recovery.

    Get Price
  • SCREEN CAPACITY CALCULATION VIBFEM Home

    is less than half the size of the wirecloth opening. The higher the percentage of small feed material the greater the screen capacity. The faster the material passes through a screen the more open area there is left to screen the remaining material. A feed material with 40% of the feed being half the opening size or smaller equates to a factor of .

    Get Price
  • Assaying Ores to determine gold content Nevada Outback

    Once you have the weight of the gold, and you have the weight of the original sample. You can use the following method to determine the weight per ton of gold in the ore. Mass assays: calculating the content. Weight of your sample in grams / 908000 grams per ton = weight of your sample in tons.

    Get Price